#189527107 Pipeline Utility Construction Inspector

JODINE KAYE ROSS

402 Sethne Court Monona, WI 53716  (608)770-2186    j.k.ross721@gmail.com

OBJECTIVE

I will use my hands-on construction 17 years of project management, mechanical, analytical, and budgeting experience, along with years of leadership, common sense, critical thinking, and attention to detail to benefit your team. I have military leadership experience, as well as a BS and MS in engineering. Water and Wastewater plant and distribution systems are my passion. I am a System Thinking, Problem Solver and Thrive in Project Environments. Document accuracy in critical to effective Inspection.

EDUCATION

MS-Manufacturing Systems Engineering (MSE)  2013   University of Wisconsin-Madison

(Engineering Management Specialization)

BS-Civil Engineering 1995 University of Wisconsin-Madison

PROFESSIONAL CREDENTIALS

E.I.T, SCADA, MS Project, Primavera, Timberline, QuickBooks, MS Office Suite, and Lotus Notes

HCSS and QuickPen Estimating System, Visio, AutoCAD, FeatureCAM, Field View, GT Viewer

EMPLOYMENT

PM/CONSULTANT 4 Years to (Present) AS-BUILT PROJECT MANAGEMNT SERVICES

»Property Management and Maintenance

»Developed City of Madison, WI Water Utility Wellhead Protection Plan

»Water Utility Construction Inspection City of Madison, WI

»June - September 2011, I conducted an embezzlement investigation for a contractor. A co-owner/CFO embezzled > $1.5M over a 2 year period. I analyzed and audited accounting records, obtained receipts, & compiled documentation so the facts & evidence could be turned over to the necessary officials ie FBI, IRS, and Attorneys & Sheriff.

WTF/ WWTF PIPE SUPERINTENDENT/APM 2 Years STAAB CONSTRUCTION CORP.

»Estimate WTF & WWTF work for Division 2 & 15.

»WWTF On-Site Pipe Superintendent & APM. Responsible for all pipe schedules, meetings, purchasing, mechanical coordination, pipe penetrations and field verification. Performed field work with the crew, recorded daily diary, kept accurate, up-to-date as-builts, and billings. Performed or collected concrete samples, air and pressure tests, mandrels, etc.

»Prepared Flange piping detail w/AutoCAD. Verified field measurements for precision pipe cuts & equipment placement. Scheduled Equipment Start-ups.

PLUMBING ESTIMATOR/ APM 2 Years J.F. AHERN CO

»Initiated a Change Initiative to gain competitive advantage over Design-Build bidding trends in commercial, industrial, and institutional construction.

»Engineering submittal preparation & review

»Created and Coded a Plumbing Design-Build (DB) Estimating Template using QuickPen Estimating Software. The existing system involved designing, estimating, and purchasing. In the new DB system, a designer or an estimator could get quality estimates out quickly. As an added Bonus, PM's could access and used it to create COs

»Trained all Plumbing Staff in using DB

»Estimator and APM for Industrial, Institutional, Commercial, Hospital, and School plan & spec plumbing and underground piping site work.

PM /ESTIMATOR/QC ENGINEER 4-1/2 Years HENSHUE CONSTRUCTION, INC.

»Estimate Water, Sewer, Storm and Telecommunications work up to $15M on HCSS

»Coded (HCSS) estimating software to estimate Telecommunication construction.

»Budgeting, PO's, CO's, billing, auditing and reconciling projects

»Worked on a pipe crew for 2 years, 1999-2000. Performed normal labor crew duties, in addition to keeping all project diaries and as-builts

»Scheduling, RFQ's, subcontractor and vendor relations

»Initiate and Maintain Reporting Documents. Timberline, HCSS, MS Office & Project.

»Quality, Accurate, Up-to-Date Records Keeping and As-Builts are my particular pet peeve!

»Proactive Project Planning, Punch List, and Job Close-out Completion are areas in construction where I have seen significant opportunities to increasing profits.

UTILITY ENGINEER 4 Years CITY OF FITCHBURG

»Construction inspection and as-built drawings of multiple projects.

»Municipal pipe design, contract documentation, & Inspection for water, sewer, storm

»Facilitated Pre-bid, Pre-construction, and Construction meetings. Most of our projects included new construction and it was critical to have everyone including local utility companies on board to reduce unforeseen problems and & keep those affected by change abreast of project status, so they could prepare and scheduled their work accordingly.

»Prepared Syene Sanitary Sewer preliminary design study.

»Site plan reviewer for the utilities (water & sewer). Reviewed all new plans to ensure that they met City specs before they were approved.

»Scheduled various phases of construction and coordinate work within the City and with various contractors, subcontractors, and various municipal organizations, i.e. police, fire, trash collection, utilities, buses and mail delivery

»Updated all water and sewer system maps. Some surveying.

»Prepared Annual PSC water & sewer plant additions, removals & abandonments reports

»Designed 2 park restroom facilities; one with City Water/Septic, the other Well/City Sewer

  • ID#: 81544
  • Location: Madison, WI , 53716

Don't Be Fooled

  • When selling, do not put your home address in your ad.
  • To avoid scams, buy and sell with people you can meet locally, in person.
  • When meeting with someone you don't know, meet in a public place. If that's not possible, have a buddy with you. Also, carry a cell phone; if you feel unsafe, you can call a trusted friend, and stay on the line.
  • Never give out financial or private information like account numbers, PayPal login, or social security number.
  • If an offer sounds too good to be true, it is. Walk away!

Look Who's Hiring!

Utilities CC&B Functional Architect Consulting
Brookfield, WI Oracle
ELT Technical Advisor Field Service Utility / ...
Madison, WI Granite Services
Jr Construction Manager
Milwaukee, WI Aegion Corporation
Utility Worker
Brookfield, WI Sodexo Inc.
Quality Control Equipment Inspector Retrograde...
Sparta, WI The Logistics Company
Quality Inspector
Menomonee Falls, WI Randstad